Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Aesthetics: |
Modern/Contemporary |
Surface: |
Galvanize Or Painted |
Certificates: |
SGS/Ce/ISO |
Lifespan: |
More Than 50 Years |
Origin: |
China |
Cost: |
Cost-effective |
Technician: |
Free Technical Support |
Advantage: |
Lightweight |
Color: |
Client's Request |
Application: |
Industrial Pre Engineered Metal Buildings |
Aesthetics: |
Modern/Contemporary |
Surface: |
Galvanize Or Painted |
Certificates: |
SGS/Ce/ISO |
Lifespan: |
More Than 50 Years |
Origin: |
China |
Cost: |
Cost-effective |
Technician: |
Free Technical Support |
Advantage: |
Lightweight |
Color: |
Client's Request |
Application: |
Industrial Pre Engineered Metal Buildings |
Steel structure warehouse provides an adaptable, cost-optimized prefab steel building enclosure optimized for commercial logistics storage, regional distribution centers, and heavy equipment storage facilities. Engineered using automated structural steel fabrication techniques, these robust pre-engineered metal buildings utilize an open clear-span design that removes internal structural columns to maximize overall storage volume. This open interior layout accelerates inventory management workflows, clears pathways for material handling equipment, and facilitates effortless overhead crane integration. Built to withstand tough environmental conditions, Ruigang’s customizable steel structure warehouse kits offer high seismic stability, fire-resistant design, and efficient on-site erection to protect your global supply chain assets.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
Roof and Wall |
Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories |
Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Clash-Free Tekla 3D Detailing: Our engineering team uses Tekla Structures to generate intelligent 3D spatial models of your building framework. This virtual modeling process resolves fitting issues between primary rafter frames, secondary purlins, and crane runways before physical fabrication starts.
Sa2.5 Grade Surface Preparation: Prior to painting or galvanizing, structural steel members undergo high-velocity centrifugal Shot Blasting to Sa2.5 Cleanliness. Removing surface rust and mill scale creates an ideal bonding profile for anti-corrosion coatings, epoxy primers, or hot-dip galvanization.
Zonal Building Code Compliance: All structural components are engineered to comply with recognized international design standards, including ASTM (US), Eurocode, and GB (China) frameworks. Every building is calculated to resist localized wind shear, snow accumulation, and regional seismic activity.
Optimized Container Shipping Blueprints: Located near Qingdao Port, we utilize 3D container packing algorithms to arrange structural steel components efficiently inside 40' HQ ocean containers, maximizing space utilization and reducing ocean freight costs.
Pre-Tensioned Friction Bolt Assemblies: Main rigid frame connections—including column-to-girder splices and roof ridge joints—are fastened using high-tensile Grade 10.9 high-strength bolts. These friction-grip assemblies create rigid moment joints designed to absorb structural deflection and crane-induced vibration.
Baseplate Shear Lugs for Structural Uplift: To prevent foundation anchor bolts from experiencing excessive horizontal shear during strong wind or seismic activity, we attach heavy steel shear keys (shear lugs) beneath main column baseplates. These lugs seat into foundation recesses, allowing anchor bolts to handle vertical uplift stability.
Thermal-Break Fasteners for Condensation Defense: Standard metal fasteners piercing roof panels can create thermal pathways where warm internal air condenses on cold fastener heads. Ruigang prevents this by using UV-stabilized thermal nylon roof insulation fasteners to break thermal pathways, avoiding interior condensation dripping.
Perimeter Flashing & Parapet Sealing: Vulnerable roof edges, wall seams, and architectural parapet walls are sealed with custom-formed galvanized Flashing & Trim profiles backed by high-tack butyl sealant tape to stop capillary water draw.
Civil-to-Steel Technical Coordination: We align technical specifications between local foundation contractors and imported steel frameworks, ensuring a precise match between concrete footings and structural steel columns.
Early Delivery of Anchor Bolt Schematics: While steel components are being fabricated in our factory, our engineering team dispatches complete Foundation Anchor Bolt Layouts and loading schematics to your site team ahead of time.
Millimeter-Accurate Embedment Metrics: These schematics provide your local civil contractor with precise coordinates, embedment depths, and positioning details for all embedded parts (embedded plates) and anchor bolt groups.
Zero-Modification Onsite Erection: Providing foundation layouts early allows civil crews to pour concrete piers accurately, ensuring primary structural columns align directly with pre-set anchor bolts without requiring field modifications.
Alphanumeric Barcode Component Tracking: Every column, beam, purlin, and bracing member carries a weather-resistant barcode label corresponding directly to your Tekla 3D erection drawings for fast site organization.
Vibration-Absorbing Timber Dunnage: Heavy timber spacers and contoured wood cushioning are placed between stacked steel members during loading to absorb ocean movement and prevent metal-on-metal friction.
Pre-Rigged Synthetic Lifting Slings: High-capacity nylon lifting slings are wrapped around heavy steel bundles inside ocean containers during factory loading.
Gouge-Free Container Unloading: Onsite crane and forklift operators attach hooks directly to these soft synthetic loops to extract components safely, preventing surface scratches caused by steel chains and preserving the Sa2.5 protective finish.
Q1: You are manufacture factory or trading company?
A: We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
A:
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
A: Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
A:Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
A:We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
A:Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
A:We are direct factory, yes, it`s competitive, price and quality are guaranteed.
![]()
Production Process
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()