Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Cost: |
Cost-effective |
Aesthetics: |
Modern/Contemporary |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Application: |
Industrial Pre Engineered Metal Buildings |
Technician: |
Free Technical Support |
Surface: |
Galvanize Or Painted |
Color: |
Client's Request |
Advantage: |
Lightweight |
Lifespan: |
More Than 50 Years |
Cost: |
Cost-effective |
Aesthetics: |
Modern/Contemporary |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Application: |
Industrial Pre Engineered Metal Buildings |
Technician: |
Free Technical Support |
Surface: |
Galvanize Or Painted |
Color: |
Client's Request |
Advantage: |
Lightweight |
Lifespan: |
More Than 50 Years |
Indoor pickleball developments housing two to twelve regulation courts, this prefabricated steel kit delivers the primary load-bearing skeleton and insulated building envelope. Groundwork, concrete slab pouring, cushioned court surfacing, and interior fit-outs stay with your local contractors, giving you direct control over site budgets. Every court grid, net-post sleeve insert, and structural bay is precision-engineered at our plant so field crews simply bolt the pre-fabricated components together on site.
Column-free clear spans ranging from 18 m to 36 m eliminate every interior support pillar, keeping 100% of the floor area open so baseline and sideline run-off zones meet tournament standards. Eave clear heights between 6 m and 12 m give high defensive lobs, indirect glare-free LED lighting arrays, and suspended acoustic baffles ample headroom without structural deflection. Every steel member is CNC-cut, welded, centrifugal shot-blasted to Sa2.5 cleanliness, coated, and tagged with weatherproof barcodes before leaving our workshop. A typical four-court hall (approx. 640 m²) loads into three to four 40'HQ containers and is bolted up by a four- to six-person crew in one to two weeks.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
| Roof and Wall | Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories | Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Commercial Pickleball Clubs & Training Academies: Member-based facilities rely on continuous court bookings. Putting four to nine courts under one unobstructed roof lets operators run league play, coaching clinics, and open sessions simultaneously without dividing the floor plan.
Schools, Universities & Athletic Campuses: Physical education programs, varsity training, and community rentals share one weatherproof hall. Modular bay spacing fits academic construction schedules and lets future phases add courts without redesigning the primary skeleton.
Municipal & Community Recreation Centers: Local authorities purchase the structural frame and envelope directly while awarding concrete slabs, court surfacing, and electrical work to district contractors—keeping project capital inside the local economy.
Resorts, Hotels & Residential Compounds: Covered courts stay operational through monsoon downpours and peak summer heat, doubling as column-free banquet or event pavilions during off-peak seasons.
Multi-Sport Indoor Arenas: Pickleball, padel, badminton, and basketball share the same wide clear-span footprint, with removable net posts and court line markings switching each bay between sports overnight.
Existing Warehouse & Shed Conversions: Industrial buildings with sufficient eave height can be re-clad, acoustically insulated, and re-lit instead of torn down. Our structural engineers audit existing steel frames against athletic wind and suspended lighting loads before issuing a quote.
Direct-Factory Pricing & ISO-Certified Fabrication: Operating as a primary steel producer, we eliminate middleman markups while enforcing ISO-certified inspections across every column, roof rafter, bolt hole, and welded seam.
Court-Specific Structural Engineering: Our engineering team sizes clear-span trusses to carry suspended acoustic baffle grids, indirect LED lighting rigs, and high-capacity HVAC ductwork without deflection, while mapping net-post inserts prior to concrete pouring.
Port-Adjacent Ocean Logistics: Located minutes from Qingdao Port, we model every shipment in 3D container staging software to raise cargo density and lower ocean freight costs.
Full-Cycle Technical Collaboration: From initial Tekla 3D spatial modeling and early anchor bolt schematics to field assembly guidance, our technical team supports your contractor through every build milestone.
High-Bay Coastal Athletic Center (Cebu, Philippines): 82 m × 36 m × 10 m. Q355B H-steel clear-span portal frame finished with alkyd anti-rust primer and custom C-purlins; V840 0.5 mm roof sheets over 8.5 mm foil thermal insulation, full-height masonry perimeter wall, 1 mm V750 galvanized mezzanine deck, and 1 mm SS304 drainage gutters. Wind-rated to 260 km/h; shipped in 7 × 40'HQ containers.
Typhoon-Rated Multi-Court Recreation Complex (Cebu, Philippines): 45 m × 19 m × 7 m. Q355B H-section skeleton with alkyd anti-corrosion primer and cold-formed C-purlins; V840 0.5 mm profile roof sheets over 8.5 mm foil insulation, perimeter brick base wall, heavy-duty steel security doors, and 304 stainless steel gutters. Wind-rated to 260 km/h; shipped in 3 × 40'HQ containers.
Long-Span Indoor Community & Sports Hall (Manila, Philippines): 142 m × 16 m × 2.45 m. H-steel main columns and roof rafters with alkyd protective coating on C-purlins; V840 0.4 mm single-skin roof over 100 mm glass wool insulation blanket, 50 mm EPS sandwich wall panels for acoustic and thermal control, and insulated access doors. Wind-rated to 250 km/h; shipped in 4 × 40'HQ containers.
Clash-Free Tekla 3D Modeling: We build a full-scale digital twin of your pickleball hall in Tekla Structures, resolving clearances between roof rafters, lighting mounts, acoustic baffles, and HVAC runs before steel cutting starts.
Sa2.5 Centrifugal Shot Blasting: Every structural profile is shot-blasted to Sa2.5 cleanliness prior to priming or hot-dip galvanizing, stripping mill scale to create a mechanical anchor profile that stops rust in humid, climate-controlled indoor arenas.
Condensation-Free Roof Fastening & Sealing: UV-stabilized thermal nylon insulation fasteners eliminate thermal bridging through roof panels, preventing interior condensation from dripping onto acrylic courts, while butyl-sealed flashing blocks wind-driven rain ingress.
Friction-Grip Joints & Baseplate Shear Lugs: Main rigid frame splices use pre-tensioned Grade 10.9 high-strength bolts to eliminate structural rattle, while welded baseplate shear lugs absorb lateral wind shear so anchor bolts handle vertical uplift exclusively.
Public-Assembly Code Compliance: Structural frames are engineered to ASTM (US), Eurocode (EU), or GB (China) standards with public-occupancy safety factors.
Volumetric 40'HQ Container Staging: Steel members are interlocked inside 40'HQ containers using 3D packing blueprints so freight density is planned rather than guessed.
First-Pass Civil-to-Steel Alignment: We work directly with your local civil engineer to match factory baseplates to concrete footings so dimensions align on the first attempt.
Advance Foundation Blueprint Dispatch: Anchor bolt placement schematics and foundation reaction tables go out while the steel frame is still in fabrication, detailing exact coordinates, embedment depths, and leveling tolerances.
Direct-Drop Bolt-Up Assembly: Civil crews pour concrete piers from advance drawings, allowing steel columns to bolt straight onto pre-set anchors upon arrival—requiring zero site cutting, field welding, or concrete chipping.
Scan-Ready Barcode Tagging: Weatherproof barcode labels on every column, rafter, purlin, and bracing rod map directly to the Tekla 3D erection sequence so site crews sort by scan rather than guesswork.
Vibration-Absorbing Timber Dunnage: Heavy timber spacing blocks and contoured wood cushioning separate stacked bundles inside containers, absorbing maritime transit vibration to keep coatings intact.
Pre-Slung Synthetic Lifting Loops: High-capacity nylon lifting slings are pre-wrapped around heavy steel bundles inside our plant. On-site cranes hook directly into soft synthetic loops rather than steel chains, ensuring the Sa2.5 anti-corrosion finish arrives unmarked.
Q1: You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
We are direct factory, yes, it`s competitive, price and quality are guaranteed.
Production Process
![]()
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()