Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Advantage: |
Lightweight |
Technician: |
Free Technical Support |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Surface: |
Galvanize Or Painted |
Aesthetics: |
Modern/Contemporary |
Cost: |
Cost-effective |
Application: |
Industrial Pre Engineered Metal Buildings |
Color: |
Client's Request |
Lifespan: |
More Than 50 Years |
Advantage: |
Lightweight |
Technician: |
Free Technical Support |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Surface: |
Galvanize Or Painted |
Aesthetics: |
Modern/Contemporary |
Cost: |
Cost-effective |
Application: |
Industrial Pre Engineered Metal Buildings |
Color: |
Client's Request |
Lifespan: |
More Than 50 Years |
Pre-engineered steel pickleball arenas by Ruigang Heavy Industry deliver a purpose-built, all-weather commercial facility engineered specifically for competitive court play, acoustics, and low-overhead operation. Manufactured on automated structural fabrication lines, these column-free clear-span structures maximize net playable square footage across every square meter of your real estate footprint.
Eliminating interior load-bearing columns allows club operators to arrange high-density court grids, maintain regulation out-of-bounds run-off zones, and integrate elevated mezzanine viewing decks or pro-shop retail lounges without visual obstruction. Calculated for strict regional wind, snow, and seismic loads, Ruigang’s prefabricated steel venues provide certified structural safety and fast-track site assembly to accelerate your club’s revenue launch.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
| Roof and Wall | Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories | Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Factory-Direct Margin Protection & ISO Rigor: By manufacturing directly in our own facilities, we remove distributor markups while enforcing strict ISO-certified inspections across every primary steel profile, bolt hole pattern, and structural weld.
Sport-Specific Structural Engineering: Our in-house engineering team calibrates clear-span roof trusses to support heavy acoustic baffle arrays, indirect glare-free LED lighting grids, and high-capacity HVAC ductwork without deflection.
Export-Optimized Container Logistics: Positioned adjacent to Qingdao Port, our shipping specialists utilize 3D volumetric container staging and protective bundling to minimize ocean freight expenses and simplify customs clearance.
Full-Cycle Project Execution Support: From initial Tekla 3D spatial modeling and early-dispatched anchor bolt plans to on-site installation guidance, our engineers collaborate with your local team through every build phase.
Case 1: High-Clearance Commercial Facility (Kenya)
Footprint & Dimensions: 120m x 20m x 8m
Structural Framing: High-yield Q355B H-steel columns and clear-span roof rafters finished with protective anti-rust primer, paired with galvanized C140 secondary purlins.
Envelope & Cladding: 0.4mm PPGI corrugated roof and wall panels; 2m perimeter concrete masonry base wall; wide electric roller shutter access doors, sliding ventilation windows, and stainless steel drainage gutters.
Load Rating & Shipping: Engineered for regional wind load compliance; consolidated and shipped efficiently via 5x40'HC ocean containers.
Case 2: Multi-Bay Commercial Complex (Mozambique)
Footprint & Dimensions: 20m x 50m x 6.5m (engineered with elevated structural load capacity for suspended equipment rigs)
Structural Framing: Heavy-duty Q355B H-steel primary framing protected with anti-corrosion primer, supported by galvanized C160 purlin systems.
Envelope & Cladding: Thick-gauge 0.6mm PPGI profile steel roof sheets; 3m masonry brick perimeter wall; 5m x 5m electric roll-up doors and aluminum-framed sliding windows.
Load Rating & Shipping: Built for heavy dynamic operational loads and regional wind standards; consolidated securely with standard export cargo.
Case 3: Large-Span Regional Center (Tanzania)
Footprint & Dimensions: 48.5m x 37.3m x 8.5m
Structural Framing: Premium Q355B H-steel primary structural skeleton coated with industrial anti-rust paint, integrated with galvanized Z160 purlins.
Envelope & Cladding: 0.5mm PPGI profile roof sheeting; full perimeter brick protection wall; commercial roll-up doors and custom 304 stainless steel rainwater gutters.
Load Rating & Shipping: Calculated for localized wind pressure standards; delivered safely via 6x40'HQ shipping containers.
Case 4: Mid-Size Covered Venue (Zambia)
Footprint & Dimensions: 29.7m x 30m x 6m
Structural Framing: Standard H-steel primary framework finished with alkyd anti-corrosion paint, paired with cold-formed C-purlin secondary members.
Envelope & Cladding: Single-skin PPGI steel roof sheets lined with fiberglass wool thermal insulation blankets; metal wall panels over a 4m base brick wall; electric roll-up doors and aluminum windows.
Load Rating & Shipping: Engineered to withstand 90km/h wind speeds; efficiently packed and shipped in 2 ocean containers.
Clash-Free Tekla 3D Modeling: Our engineers build a full-scale 3D digital twin of your pickleball arena in Tekla Structures. This virtual assembly resolves spatial clearances between roof trusses, indirect lighting mounts, acoustic baffles, and HVAC runs before fabrication starts.
Sa2.5 Centrifugal Shot Blasting: Prior to priming or galvanizing, all steel members undergo high-velocity centrifugal shot blasting to an Sa2.5 cleanliness standard. Stripping away mill scale creates a deep mechanical anchor profile that prevents rust and paint peeling in humid indoor pool or court environments.
International Building Code Calibration: All structural frames are engineered to comply with ASTM (US), Eurocode (EU), or GB (China) standards, meeting strict public-assembly safety factors for commercial sports venues.
Algorithmic 40' HQ Freight Packing: Leveraging our proximity to Qingdao Port, we use 3D container staging software to interlock structural members inside 40' HQ containers, maximizing cargo density to cut international shipping costs.
Pre-Tensioned Friction Joint Assemblies: Primary structural splices—such as column-to-girder connections and ridge nodes—are secured using Grade 10.9 high-tensile structural bolts. These pre-tensioned friction joints create rigid moment connections engineered to absorb dynamic deflections and isolate the building frame from wind sway.
Baseplate Shear Lug Integration: To shield foundation anchor bolts from excessive horizontal shear forces caused by wind uplift, we weld heavy steel shear lugs directly beneath primary column baseplates. These lugs seat into concrete foundation recesses, allowing anchor bolts to focus strictly on vertical uplift resistance.
Condensation-Free Fastening Technology: Standard metal screws penetrating roof panels form thermal bridges where internal air moisture condenses on cold screw heads. Ruigang prevents this vulnerability by using UV-stabilized thermal nylon insulation fasteners to break thermal pathways, preventing interior condensation dripping onto specialized court surfaces.
Weather-Sealed Flashing & Trim Armor: Critical building margins—including roof eave edges, wall corners, and parapet boundaries—are protected with custom-bent galvanized flashing profiles backed by butyl sealant tape to stop wind-driven rain penetration.
Weatherproof Alphanumeric Barcoding: Every column, rafter, purlin, and bracing rod carries a durable, weather-resistant barcode tag mapped directly to your Tekla 3D erection sequence for instant site sorting.
Vibration-Damping Timber Dunnage: Heavy timber spacing blocks and contoured wood cushioning layers separate stacked steel bundles inside containers, absorbing maritime transit vibrations and eliminating paint abrasion.
Pre-Rigged Synthetic Lifting Slings: High-capacity nylon lifting slings are pre-wrapped around heavy steel bundles during factory container loading.
Gouge-Free Container Offloading: Onsite crane or forklift crews hook directly into these soft synthetic loops to extract steel bundles cleanly, avoiding surface scratches from steel chains and keeping the Sa2.5 protective coating intact.
Q1: You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
We are direct factory, yes, it`s competitive, price and quality are guaranteed.
Production Process
![]()
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()