Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Technician: |
Free Technical Support |
Application: |
Industrial Pre Engineered Metal Buildings |
Surface: |
Galvanize Or Painted |
Lifespan: |
More Than 50 Years |
Advantage: |
Lightweight |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Color: |
Client's Request |
Cost: |
Cost-effective |
Aesthetics: |
Modern/Contemporary |
Technician: |
Free Technical Support |
Application: |
Industrial Pre Engineered Metal Buildings |
Surface: |
Galvanize Or Painted |
Lifespan: |
More Than 50 Years |
Advantage: |
Lightweight |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Color: |
Client's Request |
Cost: |
Cost-effective |
Aesthetics: |
Modern/Contemporary |
Prefabricated steel pickleball facility offers club operators, commercial investors, and municipal developers a weather-resistant, climate-controlled athletic venue optimized for year-round play. Manufactured on automated structural steel production lines, our pre-engineered sports halls utilize column-free clear-span framing systems that remove all interior load-bearing supports.
This wide-open interior geometry maximizes usable playing floor area, allowing flexible court configurations, generous baseline and sideline safety zones, spectator seating, and integrated pro shops or player lounges. Calculated to withstand harsh regional weather conditions and heavy operational use, Ruigang’s engineered sports hall packages deliver verified seismic stability, effective acoustic control, and rapid on-site assembly to maximize your commercial returns.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
| Roof and Wall | Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories | Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Direct-Factory Manufacturing & Quality Rigor: Operating as a direct fabricator, we eliminate middleman overhead while executing strict ISO-certified quality inspections across all steel columns, roof trusses, connection plates, and structural welds.
Custom Engineering for Regional Codes: Our specialized engineering team converts athletic layout requirements into code-compliant blueprints, accurately calculating structural resistance against localized wind shear, snow accumulation, and seismic activity.
Optimized Ocean Logistics: Located adjacent to Qingdao Port, our logistics department utilizes specialized container packing schemes and protective export packaging to maximize space efficiency and reduce maritime shipping costs.
Lifecycle Technical Collaboration: From initial 3D Tekla detailing and early-dispatch anchor bolt blueprints to post-delivery field erection support, we provide continuous technical collaboration throughout your project lifetime.
Case 1: Multi-Court Covered Sports Complex (Cebu, Philippines)
Footprint & Height: 45m x 19m x 7m
Primary Framing & Surface Protection: Robust H-steel main skeleton finished with anti-corrosive alkyd paint, paired with cold-formed C-purlin secondary members.
Wall & Roof Enclosure: V840 0.5mm profile steel roof sheets featuring 8.5mm aluminum foil insulation backing and stainless steel wire mesh; full masonry base wall; heavy steel security doors and 304 stainless steel drainage gutters.
Performance & Ocean Logistics: Engineered to resist tropical typhoon gusts up to 260km/h; safely loaded and transported in 3x40'HQ ocean containers.
Case 2: Multi-Purpose Athletic & Community Center (Manila, Philippines)
Footprint & Height: 142m x 16m x 2.45m
Primary Framing & Surface Protection: High-strength H-steel main columns and roof trusses painted with protective anti-corrosion alkyd primer, supported by C-section purlins.
Wall & Roof Enclosure: V840 0.4mm single-skin metal roof sheets paired with 100mm glass wool thermal blanket insulation; 50mm EPS sandwich wall panels for sound and heat regulation; insulated access doors.
Performance & Ocean Logistics: Built for typhoon-prone coastal zones up to 250km/h wind ratings; organized and transported across 4x40'HQ containers.
Case 3: Commercial Indoor Recreation Hall (Texas, USA)
Footprint & Height: 115.84m x 39.73m x 7.3m
Primary Framing & Surface Protection: Precision-engineered Q355B H-beam main framework sealed with high-durability epoxy protective paint, paired with cold-formed C-purlins.
Wall & Roof Enclosure: V840 0.5mm roof panels and V900 0.5mm wall sheets forming a tight structural envelope optimized for climate-controlled indoor sports.
Performance & Ocean Logistics: Engineered in full compliance with US structural wind standards (143mph wind rating); packaged and delivered via 7x40'HQ containers.
Collision-Free Tekla 3D Detailing: Our engineering department builds an exact 3D digital twin of your sports facility inside Tekla Structures. This virtual modeling eliminates spatial conflicts between main columns, roof trusses, lighting grid supports, and HVAC ductwork long before steel cutting begins.
Sa2.5 Centrifugal Surface Blast Cleaning: Prior to applying protective paint coatings or galvanization, all structural steel section undergoes high-velocity centrifugal shot blasting to an Sa2.5 cleanliness rating. Removing mill scale and oxides creates an optimal surface profile that anchors anti-corrosion finishes for decades.
Code Calibration for Public Assembly: We calculate all structural components to meet international building standards, including ASTM (US), Eurocode (EU), and GB (China) design frameworks, ensuring full safety compliance for public occupancy and commercial recreational use.
Volumetric Container Freight Optimization: Leveraging our location near Qingdao Port, we use algorithmic container packing software to interlock heavy steel members inside 40' HQ ocean containers, maximizing space efficiency to lower import shipping overhead.
Alphanumeric Component Tagging: Every column, rafter, purlin, and bracing member receives a durable, weather-resistant barcode label that corresponds directly with your 3D Tekla erection manual for instant site sorting.
Soft Dunnage Cushioning: To protect anti-corrosion paint finishes during ocean transit, heavy timber spacing blocks and protective dunnage layers are arranged between stacked steel members to absorb transit vibrations and prevent metal-on-metal abrasion.
Pre-Slung Synthetic Lifters: Heavy structural steel bundles are loaded into containers with high-capacity synthetic nylon lifting slings pre-wrapped around key lifting points.
Gouge-Free Container Offloading: On-site crane or forklift teams can clip directly to these soft synthetic slings to slide heavy bundles out of containers safely, eliminating surface gouging caused by steel chains and preserving the Sa2.5 protective coating system.
Q1: You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
We are direct factory, yes, it`s competitive, price and quality are guaranteed.
Production Process
![]()
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()