Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Technician: |
Free Technical Support |
Application: |
Industrial Pre Engineered Metal Buildings |
Surface: |
Galvanize Or Painted |
Lifespan: |
More Than 50 Years |
Advantage: |
Lightweight |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Color: |
Client's Request |
Cost: |
Cost-effective |
Aesthetics: |
Modern/Contemporary |
Technician: |
Free Technical Support |
Application: |
Industrial Pre Engineered Metal Buildings |
Surface: |
Galvanize Or Painted |
Lifespan: |
More Than 50 Years |
Advantage: |
Lightweight |
Origin: |
China |
Certificates: |
SGS/Ce/ISO |
Color: |
Client's Request |
Cost: |
Cost-effective |
Aesthetics: |
Modern/Contemporary |
Prefabricated steel structure pickleball facility provides club owners, municipal developers, and commercial investors with a highly durable, climate-controlled athletic venue designed for year-round sports operations. Fabricated on automated structural steel assembly lines, our pre-engineered sports hall kits utilize an expansive clear-span structural framework that completely eliminates intrusive interior load-bearing columns.
This unobstructed internal layout maximizes active playing real estate, allowing for flexible multi-court layouts, generous out-of-bounds safety margins, spectator seating zones, and integrated pro-shop or lounge amenities. Built to endure severe weather conditions and dynamic operational demands, Ruigang’s engineered pickleball court buildings deliver certified seismic stability, superior acoustic dampening, and accelerated on-site erection to secure a high return on investment.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
| Roof and Wall | Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories | Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Direct-Factory Manufacturing & Quality Control: Operating as a direct producer, we eliminate middleman markups while enforcing strict ISO-certified quality control across every steel column, roof truss, connection plate, and welded seam.
Customized Structural Engineering: Our specialized engineering team converts complex athletic requirements into code-compliant blueprints, accurately calculating structural resistance against localized wind uplift, snow loads, and seismic forces.
Optimized Maritime Logistics: Situated adjacent to Qingdao Port, our logistics division deploys specialized container loading arrangements and protective export packaging to maximize cargo density and reduce ocean freight expenses.
End-to-End Technical Collaboration: From initial 3D Tekla component detailing and early-dispatched foundation anchor schematics to field erection guidance, we provide continuous technical collaboration through every phase.
Case 1: Multi-Court Covered Sports Complex (Cebu, Philippines)
Dimensions: 45m x 19m x 7m
Structural Framing: Robust H-steel primary skeleton treated with alkyd anti-corrosion paint, paired with cold-formed C-purlin secondary structural members.
Wall & Roof Enclosure: V840 0.5mm corrugated roof panels backed with 8.5mm foil insulation cotton and supporting stainless steel wire mesh; full perimeter masonry base wall; heavy steel security doors and 304 stainless steel gutters.
Performance & Ocean Logistics: Engineered to withstand typhoon wind forces up to 260km/h; safely loaded and shipped in 3x40'HQ containers.
Case 2: Multi-Purpose Athletic & Community Center (Manila, Philippines)
Dimensions: 142m x 16m x 2.45m
Structural Framing: High-strength H-steel main columns and roof rafters coated with alkyd anti-rust primer, featuring C-section purlin secondary framing.
Wall & Roof Enclosure: V840 0.4mm single metal roof sheets with 100mm glass wool ceiling insulation; 50mm EPS sandwich wall panels for acoustic and thermal control; insulated panel doors.
Performance & Ocean Logistics: Built for typhoon-prone coastal zones up to 250km/h wind speed ratings; efficiently organized and transported across 4x40'HQ containers.
Case 3: Commercial Indoor Recreation Hall (Texas, USA)
Dimensions: 115.84m x 39.73m x 7.3m
Structural Framing: Precision-engineered Q355B H-beam main framework sealed with high-performance protective epoxy paint, supported by cold-formed C-purlins.
Wall & Roof Enclosure: Single-skin V840 0.5mm roof sheets and V900 0.5mm wall cladding, providing a weather-tight structural envelope optimized for climate-controlled indoor sports.
Performance & Ocean Logistics: Designed to comply with US building and wind codes (143mph wind rating); packaged and delivered via 7x40'HQ containers.
Collision-Free Tekla 3D Detailing: Our engineering department builds an exact 3D digital twin of your sports facility inside Tekla Structures. This virtual modeling eliminates spatial conflicts between main columns, roof trusses, lighting grid supports, and HVAC ductwork long before steel cutting begins.
Sa2.5 Centrifugal Surface Blast Cleaning: Prior to applying protective paint coatings or galvanization, all structural steel section undergoes high-velocity centrifugal shot blasting to an Sa2.5 cleanliness rating. Removing mill scale and oxides creates an optimal surface profile that anchors anti-corrosion finishes for decades.
Code Calibration for Public Assembly: We calculate all structural components to meet international building standards, including ASTM (US), Eurocode (EU), and GB (China) design frameworks, ensuring full safety compliance for public occupancy and commercial recreational use.
Volumetric Container Freight Optimization: Leveraging our location near Qingdao Port, we use algorithmic container packing software to interlock heavy steel members inside 40' HQ ocean containers, maximizing space efficiency to lower import shipping overhead.
Pre-Tensioned Friction Joint Assemblies: Main structural frame connections—such as column-to-girder splices and roof ridge nodes—are secured using high-tensile Grade 10.9 structural bolts. These friction-grip fasteners create rigid moment connections designed to absorb dynamic deflections and isolate the building frame from wind sway.
Baseplate Shear Lug Integration: To shield foundation anchor bolts from horizontal shear forces caused by severe wind uplift, we weld heavy steel shear lugs directly beneath primary column baseplates. These lugs seat into foundation recesses, allowing anchor bolts to focus strictly on vertical uplift stability.
Condensation-Free Fastening Mechanics: Standard metal fasteners piercing roof panels form thermal bridges where internal air moisture condenses on cold screw heads. Ruigang prevents this vulnerability by utilizing UV-stabilized thermal nylon insulation fasteners, breaking thermal pathways and preventing condensation dripping onto specialized court surfaces.
Weather-Sealed Flashing & Trim Profiles: Critical building boundaries—including roof eave edges, wall corners, and parapet margins—are protected with custom-bent galvanized flashing profiles backed by butyl sealant tape to prevent wind-driven rain penetration.
Q1: You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
We are direct factory, yes, it`s competitive, price and quality are guaranteed.
Production Process
![]()
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()