Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Aesthetics: |
Modern/Contemporary |
Surface: |
Galvanize Or Painted |
Certificates: |
SGS/Ce/ISO |
Lifespan: |
More Than 50 Years |
Origin: |
China |
Cost: |
Cost-effective |
Technician: |
Free Technical Support |
Advantage: |
Lightweight |
Color: |
Client's Request |
Application: |
Industrial Pre Engineered Metal Buildings |
Aesthetics: |
Modern/Contemporary |
Surface: |
Galvanize Or Painted |
Certificates: |
SGS/Ce/ISO |
Lifespan: |
More Than 50 Years |
Origin: |
China |
Cost: |
Cost-effective |
Technician: |
Free Technical Support |
Advantage: |
Lightweight |
Color: |
Client's Request |
Application: |
Industrial Pre Engineered Metal Buildings |
Steel structure warehouse offers a modern prefab steel building solution designed to meet the demands of fast-growing businesses. Built with structural steel fabrication, these pre-engineered metal buildings feature a column-free clear-span design to maximize usable interior space.
This open layout simplifies inventory management, speeds up material handling, and easily accommodates overhead crane integration. Ruigang’s customizable steel structure warehouse kits provide reliable seismic stability, fire-resistant performance, and fast on-site erection to keep your project moving forward smoothly.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
Roof and Wall |
Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories |
Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Clear 3D Modeling: Using Tekla Structures, our team models every section of your warehouse in 3D. This helps ensure components fit together neatly during assembly without unexpected site adjustments.
Sa2.5 Surface Preparation: All structural steel undergoes Shot Blasting to Sa2.5 Cleanliness before paint or galvanizing is applied, creating a clean surface that helps protective coatings last longer.
Designed for Regional Codes: We design components to align with common international building standards, including ASTM (US), Eurocode, and GB (China), accounting for local wind and snow conditions.
Efficient Shipping Staging: Located near Qingdao Port, we organize components inside 40' HQ ocean containers to maximize space and manage shipping expenses.
High-Strength Bolted Joints: Main frame connections use Grade 10.9 high-strength bolts to create firm, durable joints that handle daily building loads and crane movement.
Baseplate Shear Lugs: Steel shear keys (shear lugs) are welded beneath main column baseplates to help distribute horizontal loads into the foundation.
Thermal Fastener Seals: Roof panels feature thermal nylon roof insulation fasteners to minimize thermal bridging and reduce interior moisture condensation.
Protective Trim & Flashing: Key joints and parapet walls are fitted with galvanized Flashing & Trim profiles to protect the building envelope from water intrusion.
Foundation Layout Support: We provide clear Foundation Anchor Bolt Layouts and loading specs early in the process to assist your local concrete team.
Accurate Coordinate Specs: Detailed drawings specify exact placement metrics for embedded parts (embedded plates) and anchor bolt sets.
Smooth On-Site Fitting: Delivering layout details ahead of time allows foundation work to be completed accurately, helping steel columns drop smoothly onto pre-set bolts.
Labeled Structural Pieces: Components are tagged with clear alphanumeric labels matching your assembly drawings for easy sorting on site.
Protective Wood Dunnage: Timber spacers are placed between stacked steel pieces to prevent metal-on-metal friction during ocean travel.
Pre-Set Lifting Slings: Soft nylon lifting slings are pre-wrapped around steel bundles inside containers to allow safe crane or forklift extraction without scratching surface coatings.
Q1: You are manufacture factory or trading company?
A: We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
A:
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
A: Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
A:Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
A:We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
A:Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
A:We are direct factory, yes, it`s competitive, price and quality are guaranteed.
![]()
Production Process
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()