Qingdao Ruigang Steel Structure Co., Ltd. sales3@ruiganggroup.com 86--13370850031
Product Details
Place of Origin: China
Brand Name: RG_STEEL
Certification: SGS, BV,ISO
Model Number: RG_STEEL
Payment & Shipping Terms
Minimum Order Quantity: 199 Square Meter
Price: USD30-USD99 Per Square Meter/ Negotiable
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 19999 Square Meter Per Month
Origin: |
China |
Surface: |
Galvanize Or Painted |
Lifespan: |
More Than 50 Years |
Cost: |
Cost-effective |
Certificates: |
SGS/Ce/ISO |
Technician: |
Free Technical Support |
Aesthetics: |
Modern/Contemporary |
Application: |
Industrial Pre Engineered Metal Buildings |
Color: |
Client's Request |
Advantage: |
Lightweight |
Origin: |
China |
Surface: |
Galvanize Or Painted |
Lifespan: |
More Than 50 Years |
Cost: |
Cost-effective |
Certificates: |
SGS/Ce/ISO |
Technician: |
Free Technical Support |
Aesthetics: |
Modern/Contemporary |
Application: |
Industrial Pre Engineered Metal Buildings |
Color: |
Client's Request |
Advantage: |
Lightweight |
Steel structure warehouse represents a highly resilient, cost-optimized prefab steel building strategy tailored for modern commercial logistics storage, global distribution centers, and heavy equipment storage facilities. Formed through precision-driven structural steel fabrication methods, these robust pre-engineered metal buildings feature an expansive, column-free clear-span design to maximize usable interior floor space. This wide-open layout optimizes inventory management workflows, clears pathways for automated material handling equipment, and simplifies overhead crane integration. Built to withstand extreme environmental forces, Ruigang’s customizable steel structure warehouse kits deliver exceptional seismic stability, fire-resistant design, and rapid on-site erection to secure your physical supply chain assets worldwide.
| Items | Detailed Specifications |
|---|---|
| Main Steel Frame(Column+Beam) | Q235,Q345 Welded H Section Steel |
| Secondary Frame | Purlin: Q235 C and Z purlin |
| Bracing: Q235 Round Bar,Angle Steel,Steel Pipe | |
Roof and Wall |
Insulation: EPS/Fiber glass wool/Rock wool/PU |
| Sheeting: PPGI single Sheet | |
| Design Standards | GB/T, AISC, Eurocode, or Local Building Codes Compliance |
| Accessories |
Windows: Aluminum Alloy /PVC Window,etc. |
| Doors: Sliding/swing sandwich panel door/Roll-up Door | |
|
Draining system: Stainless/PPGI single sheet gutter+ PVC pipe |
|
| Anti-rust options |
Anti-rust painting(Alkyd/Epoxy) or Galvanized |
Clash-Free Tekla 3D Detailing: Our engineering department relies on Tekla Structures to generate intelligent 3D spatial models of your warehouse chassis. This virtual pre-assembly eliminates physical component collisions between primary rafter frames, secondary purlins, and crane runways long before fabrication begins.
Sa2.5 Grade Surface Texturing: Before protective coatings are applied, every structural member undergoes high-velocity centrifugal Shot Blasting to Sa2.5 Cleanliness. Stripping raw steel down to bare metal establishes an optimal mechanical anchor for anti-corrosion epoxies, fireproofing coats, or long-lasting hot-dip galvanization.
Zonal Code & Environmental Calibration: We compute all structural components to satisfy international regulatory standards, including ASTM (US), Eurocode, and GB (China) design frameworks. Each warehouse layout is calculated to withstand localized wind forces, heavy snow accumulation, and regional seismic ground motion.
Volumetric Container Freight Optimization: Capitalizing on our proximity to Qingdao Port, we deploy algorithmic 3D container packaging blueprints to interlock structural components inside 40' HQ ocean containers, maximizing space density and minimizing cross-border ocean freight costs.
Pre-Tensioned Friction Joint Assemblies: Main rigid frame splices—including column-to-girder joints and peak roof nodes—are fastened using high-tensile Grade 10.9 high-strength bolts. These friction-grip fasteners form rigid moment connections engineered to absorb building deflections and resist dynamic vibrations from traveling bridge cranes.
Baseplate Shear Key Interlocking: To shield foundation anchor bolts from excessive lateral shear caused by wind loads or ground acceleration, we weld heavy-gauge steel shear keys (shear lugs) directly beneath main column baseplates. These lugs interlock into foundation recesses, allowing anchor bolts to focus strictly on vertical uplift stability.
Thermal-Break Fastening Mechanics: Standard metal screws piercing roof panels create thermal bridges where warm internal air condenses on cold fastener heads. Ruigang eliminates this vulnerability by utilizing UV-stabilized thermal nylon roof insulation fasteners to break thermal pathways, preventing interior condensation dripping and preserving insulation performance.
Perimeter Flashing & Parapet Armor: Vulnerable roof edges, wall seams, and architectural parapet walls are protected with custom-formed, heavy-gauge galvanized Flashing & Trim profiles backed by high-tack butyl sealant tape to stop capillary water draw.
Proactive Civil-to-Steel Synchronization: We bridge the technical gap between local concrete contractors and imported steel framing, guaranteeing an exact, error-free connection between your concrete footings and structural columns.
Early-Stage Foundation Layouts: While your warehouse framework is being manufactured in our plant, our engineers immediately dispatch detailed Foundation Anchor Bolt Layouts and structural load diagrams ahead of schedule.
Accurate Positioning Metrics: These technical blueprints provide your local civil contractor with millimeter-accurate coordinates, embedment depths, and positioning data for all embedded parts (embedded plates) and foundation bolt groupings.
Turnkey Onsite Verification: Delivering layout schematics early allows civil teams to pour concrete with total confidence, ensuring structural uprights drop onto pre-set anchor bolts without requiring field modifications or concrete chipping.
Individual Component Barcode Labeling: Every column, beam, purlin, and bracing member is marked with a weather-resistant, unique alphanumeric tag corresponding directly to your Tekla 3D erection manual for instant site organization.
Vibration-Absorbing Timber Dunnage: To safeguard protective coatings during ocean transit, heavy-duty timber spacing blocks and contoured wood cushioning layers are placed between stacked members to absorb vibrations and eliminate metal-on-metal friction.
Pre-Rigged Synthetic Lifters: High-capacity nylon lifting slings are pre-wrapped around heavy steel bundles inside the ocean containers during factory loading.
Safe, Non-Destructive Stripping: Onsite crane or forklift operators can attach hooks directly to these soft synthetic loops to extract components safely, avoiding the surface gouging caused by steel chains and fully preserving the Sa2.5 anti-corrosion coating.
Q1: You are manufacture factory or trading company?
A: We are direct manufacture factory, located in Qingdao, China, very close to Qingdao port. we have strictly quality management system,professional design team, strong production capacity and rich manufacturing experience.
Q2: How about your quality control?
A:
1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct
100% strict testing on the raw materials before entering our factory.
2)our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
4)Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.
Q3: What's the delivery time?
A: Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.
Q4:Do you offer service for installation?
A:Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
Q5:What's the payment term?
A:We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
2)100% irrevoable L/C
Q6:How to get a fast quotation?
A:Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.
Q7:Is your price competitive compared with other companies?
A:We are direct factory, yes, it`s competitive, price and quality are guaranteed.
![]()
Production Process
![]()
Packing & Loading:
![]()
Our Steel Structure Fabricaiton Factory:
![]()
![]()
![]()
![]()
Certification
![]()
Product Attributes
![]()
![]()
![]()