Company News About How to Start Building a Steel Structure High-Rise Building

How to Start Building a Steel Structure High-Rise Building

2025-10-15
Latest company news about How to Start Building a Steel Structure High-Rise Building

Steel structure high-rise buildings hold a central position in modern urban development, thanks to their high strength, lightweight characteristics, and extremely fast construction speed. Compared to traditional concrete structures, steel structures significantly shorten on-site schedules by shifting most of the work to off-site factories (i.e., pre-fabrication).

Launching such a complex project requires a systematic process. Referencing the general steps of high-rise construction, this article will focus primarily on the critical phase of Steel Structure Framework Construction.

I. Preliminary Preparation and Planning

Site Analysis and Design: Conduct detailed land surveying and soil testing. Based on the test results, structural engineers perform complex structural modeling and calculations to ensure the steel system can effectively withstand lateral forces like wind and seismic loads.

Foundation Construction: High-rise buildings require robust deep foundations (such as piling). Excavation, foundation type selection, and concrete pouring for the pile cap must be completed before steel erection can begin.

II. The Core: Erection of the Steel Structural Framework

This is the defining phase of a steel structure high-rise, characterized by pre-fabrication, high-altitude work, and extreme demands for precision.

1. Pre-Fabrication and Fabrication The secret to the efficiency of steel construction lies in pre-fabrication. All components (steel columns, beams, connection plates, etc.) are precisely cut, drilled, and welded in an off-site factory based on detailed Shop Drawings. This factory-based production model ensures:

Quality Control: Welding and dimensional accuracy far surpass on-site work.

Construction Efficiency: The site is used for assembly rather than large-scale manufacturing.

2. Transportation and Logistics Transporting the pre-fabricated, often massive, steel components to the construction site requires a precise logistics plan. Components must arrive just-in-time and in the correct sequence to ensure continuity of the on-site erection work.

3. Erection and Positioning The central activity on-site is Steel Structure Erection.

Equipment Use: Work primarily relies on large Cranes and Rigging to lift heavy steel members to heights of dozens or even hundreds of meters.

Precise Alignment: Steel components are connected to foundation anchor bolts or previously installed members below. The installation process demands extremely high levels of plumbness and levelness, requiring continuous Alignment checks to ensure the accuracy of every floor plate and column grid.

4. Connection and Bolting/Welding Once positioned and aligned, components are permanently joined using:

High-Strength Bolting: This is the most common method, allowing for a degree of flexibility and fast installation.

On-Site Welding: Used for specific joints or connections requiring higher integrity. It is in this phase that the stability and integrity of the steel frame are fully established, supporting all of the building's vertical loads and resisting the lateral forces from strong winds and earthquakes.

III. Subsequent Finishing Phases

Once the main structural framework is complete, the building proceeds to the other stages.

Building Envelope: Installation of the facade, curtain walls, windows, and doors, alongside critical waterproofing and insulation work.

Interior Construction: Deployment of Mechanical, Electrical, and Plumbing (MEP) systems, followed by interior partitioning, fit-out, and finishing work.

Inspections and Handover: All necessary functional testing, safety inspections, and final certifications are conducted, leading to project completion and handover.

[About Us]

Qingdao Ruigang Heavy Industry Co., Ltd. is a national high-tech enterprise specialized in design, manufacture and installation of steel structure buildings and prefabricated houses.

With more than 20-year unremitting efforts, Ruigang has gained rich experience on exportation. Its annual export volume is up to USD 20 million and products are widely applied in more than 70 countries and regions.

Events
Contacts
Contacts: Mr. Steven Gao
Contact Now
Mail Us