logo
Qingdao Ruigang Steel Structure Co., Ltd. 企業紹介
製品
ホーム > 製品 > PEB鋼構造 > Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication
製品詳細
ハイライト:

prefabricated steel warehouse building

,

PEB metallic workshop construction

,

steel structure hangar shed fabrication

学年:
Q235 / Q355 / Q235B / Q355B
接続タイプ:
ボルト締め、溶接
応用:
産業用および商業用
タイプ:
プレハブ鉄骨造建物
設計基準:
AISC、MBMA、AWS、ASTM
風荷重:
最高300km/h
表面処理:
溶融亜鉛めっき、塗装
壁被覆材:
亜鉛メッキ鋼板、サンドイッチパネル、金属クラッド
学年:
Q235 / Q355 / Q235B / Q355B
接続タイプ:
ボルト締め、溶接
応用:
産業用および商業用
タイプ:
プレハブ鉄骨造建物
設計基準:
AISC、MBMA、AWS、ASTM
風荷重:
最高300km/h
表面処理:
溶融亜鉛めっき、塗装
壁被覆材:
亜鉛メッキ鋼板、サンドイッチパネル、金属クラッド
製品説明
Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication
Description

At Ruigang, a superior PEB structure begins with intelligent design. Our technical team balances safety, aesthetics, and cost-efficiency to deliver high-performance structural solutions tailored to your project’s specific load requirements.

  • Advanced 3D Modeling (Tekla & AutoCAD): We utilize Tekla Structures for full-scale 3D detailing of the PEB framework. This ensures a "zero-clash" design where every bolt hole and connection fits perfectly, eliminating the need for on-site modifications and reducing labor costs.

  • Global Code Compliance: Our engineers are experts in adapting PEB designs to meet international standards, including ASTM (US), Eurocode, and GB (China). We ensure your building is calibrated to withstand specific regional wind velocities, snow loads, and seismic requirements.

  • Optimized Value Engineering: We don’t just design; we optimize. By using varying-depth members and high-tensile steel, we minimize material waste while maximizing structural integrity, ensuring the most cost-effective result for your capital investment.

ITEMS SPECIFICATION
Main Steel Q355, Q235, Q355B, Q235B, etc.
Anti-rust protection Hot-dip galvanized or anti-rust painting
Purlin and girts Cold-rolled C or Z steel, Q355 or Q235
Column & Beam Welded or Hot rolled H-section
Connection method of steel structure Welding connection or bolt connection
Wall & Roof Sandwich panel or steel sheet.
Door Rolled up door or Sliding door
Window Plastic steel or Aluminum alloy window
Surface Hot-dip galvanized or painted
Crane 5MT, 10MT, 15MT, and more
Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 0
Product Advantage:

Our production facility utilizes automated technology to ensure every PEB component meets the most rigorous engineering tolerances.

  1. Precision CNC Fabrication: We employ multi-axis CNC high-definition cutting systems to achieve millimeter-level accuracy for tapered columns and rafters.

  2. Automated Fusion Welding: All primary PEB members undergo Submerged Arc Welding (SAW), creating deep-penetration, defect-free joints that provide superior structural stability under heavy loads.

  3. High-Speed Shot Blasting (Mechanical De-rusting): Every steel member undergoes a high-velocity Shot Blasting process to achieve an Sa2.5 grade finish. This mechanical treatment uses high-speed centrifugal impellers to propel steel abrasives, effectively removing all oxidation, mill scale, and rust. This creates a superior surface profile and rough texture for maximum industrial-grade coating or galvanization adhesion.

Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 1


Quality Control & Certifications

Quality at Ruigang is verified through international benchmarks and a multi-stage inspection protocol.

  • Authoritative Certifications (ISO & CE): Our facility is ISO 9001:2015 certified for quality management, and our products carry the CE Mark, confirming full compliance with European health and safety standards.

  • Raw Material Traceability: We maintain 100% traceability for all Q355B/Q235B structural steel through original Mill Test Certificates (MTC).

  • Non-Destructive Testing (NDT): Critical load-bearing welds undergo Ultrasonic Testing (UT) and Magnetic Particle Testing (MT) by certified inspectors to guarantee subsurface integrity.

  • Factory Trial Assembly: Complex structural nodes are trial-fitted at our facility to validate geometry and alignment before they are cleared for global dispatch.

Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 2

Global Logistics & Installation Support

Strategically located near Qingdao Port, we leverage our geographic advantage to reduce lead times and transit risks.

  • Volumetric Nesting Technology: We use 3D nesting software to optimize loading into 40' HQ containers, maximizing space and significantly lowering landed shipping costs for the client.

  • Safe-Transit Bundling: Components are secured using specialized steel cradles and high-tensile strapping to prevent movement, abrasion, or structural distortion during maritime transit.

  • Intuitive Identification System: Every member is etched with a unique tracking code corresponding to our 3D shop drawings, making on-site sorting and installation intuitive for local crews.

Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 3
FAQ:
  1. You are manufacture factory or trading company?

    As a direct manufacturing facility based in Qingdao, China—just a stone's throw away from the Qingdao Port—we pride ourselves on our stringent quality management system, expert design team, robust production capabilities, and extensive manufacturing experience.

  2. How about your quality control?

    1)we only cooperate with high-quality raw material suppliers with strength and reputation, and our quality inspection department will conduct 100% strict testing on the raw materials before entering our factory.
    2) our workers are all certified and regularly assessed, In this way, we can guarantee the production quality.
    3)During the production process, we have three parts: self-inspection, mutual inspection, and workshop inspection. Only qualified product can move to next step.
    4) Before delivery, inspection working will check everything with delivery list, to ensure that we send you every items and you can install it locally.

  3. What's the delivery time?

    Usually 30 days. Don't worry about the delivery time at all, we have perfect management plan for each project, then deliver to you on time.

  4. Do you offer service for installation?

    Yes,But we will provide very detailed installation drawings and videos. Generally, you can install it locally,they are all prefabricated and bolted. Otherwise , we can also send engineer for guiding installation.

  5. What's the payment term?

    We have two payment terms.
    1) 30% advance payment before producing by T/T, and 70% balance by T/T before shipping.
    2) 100% irrevoable L/C

  6. How to get a fast quotation?

    Please send us your project preliminary drawing, then we would quote you accordingly in 2days. Or we confirm several questions with you, then do quotation list with details for you timely.

  7. Is your price competitive compared with other companies?

    We are direct factory, yes, it`s competitive, price and quality are guaranteed.

Our Steel Structure Fabricaiton Factory

Qingdao Ruigang Heavy Industry Co., Ltd. is a world-class authority in industrial steel solutions. With thousands of successful projects across 50+ countries, we provide the foundational framework for your long-term business success.

Engineering a more resilient future, one PEB structure at a time. Contact Ruigang Heavy Industry today for a professional engineering consultation and a transparent technical proposal.

Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 4
Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 5
Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 6

Product Attributes
Prefabricated Steel Structure Construction for Peb Metallic Warehouse Workshop Hangar Shed Building Fabrication 7
総格付け
5.0
★★★★★
★★★★★
最近の50件のレビューに基づいて
最高
100%
4つ星
0
3つ星
0
2つ星
0
星1つ
0
すべてのレビュー
  • A
    Apiza Mbwesi
    Congo Jan 18.2026
    ★★★★★
    ★★★★★
    Very happy to see the materials are of very good quality, and packed very well for shipping, excellent after-sales service regarding unloading and installation, always fast response, favorable price, fast delivery, will definitely cooperate again, my very good partner
  • F
    Frideus Oyoku
    Australia Dec 31.2025
    ★★★★★
    ★★★★★
    Quality : The quality is much better than I see from the pictures . Delivery : delivery time is also very fast , Then we can begin the installation asap . A very good purchase exprience .
  • K
    Karim Dharsi Dhandho
    Uruguay Mar 8.2023
    ★★★★★
    ★★★★★
    Top-quality steel structures and outstanding customer service. Every detail was handled carefully, and delivery was on time. We are impressed by Steven's professionalism and will continue our cooperation.